Manila Water’s lake system boosts water security for El Niño and beyond


MANILA, Philippines — As weather patterns become increasingly unpredictable, water security depends not only on having enough supply today, but also on developing diverse and resilient sources that can withstand the challenges of tomorrow.
Manila Water continues to expand its Laguna de Bay water supply system as a key component of its long-term strategy to sustain reliable, 24/7 water service across the East Zone. By drawing from Laguna de Bay, the company gains greater operational flexibility and reduces its reliance on the Angat-Ipo-La Mesa system, particularly during prolonged dry periods and lower water allocations.
The Laguna de Bay system currently includes the Cardona Water Treatment Plant and the East Bay Phase 1 Water Treatment Plant, with the upcoming East Bay Phase 2 Water Supply System Project set to provide a significant additional supply.
Article continues after this advertisement
READ: Manila Water urges customers to prepare wisely for strong El Niño
FEATURED STORIES
NEWSINFO
NEWSINFO
NEWSINFO
Located in Cardona, Rizal, the Cardona Water Treatment Plant was Manila Water’s first major facility to tap the central part of Laguna Lake as an additional raw water source. The plant can provide up to 100 million liters per day (MLD), helping meet the requirements of communities in Rizal and supporting the stability of the broader East Zone distribution network.
Further strengthening the system is the 50-MLD East Bay Phase 1 Water Treatment Plant, which draws raw water from the eastern flank of the lake. The facility serves growing communities in Rizal and provides Manila Water with additional flexibility in managing supply across its service area. It features an eight-million-liter reservoir and a multi-stage treatment process using dissolved air flotation, granular activated carbon filtration, and reverse osmosis technologies.
Manila Water is also nearing the completion of the East Bay Phase 2 Water Supply System Project. Designed to add up to 200 MLD, the project includes a new water treatment plant and intake facility in Barangay Kabulusan, Pakil, Laguna, as well as transmission infrastructure that will carry treated water across the lake and connect it to the company’s distribution network.
Once East Bay Phase 2 becomes operational, Manila Water’s Laguna de Bay facilities will have a combined treatment capacity of up to 350 MLD. The additional supply will reinforce water availability for customers in Pasig, Pateros, Taguig, and parts of Rizal Province, while supporting future demand growth across the East Zone.
Article continues after this advertisement
“Water security means having a diversified and resilient supply system that can respond to changing conditions. Through the Cardona and East Bay facilities, Laguna de Bay has become an important part of our efforts to sustain 24/7 water service, especially as we prepare for stronger El Niño episodes and other weather-related challenges,” Manila Water Communication Affairs Department Head Dittie Galang said.
READ: Manila Water readies 33 reservoirs for prolonged El Niño
Article continues after this advertisement
These investments reflect Manila Water’s continuing shift toward a more diversified water supply portfolio. Alongside its other water sources and infrastructure projects, the Laguna Lake system gives the company greater flexibility to balance available supply, manage periods of reduced availability from traditional sources, and respond to the needs of growing communities.
Beyond preparing for the next El Niño, Manila Water is building a water supply system that can adapt to varying weather conditions over the long term. Through continued investments in augmenting sources such as Laguna de Bay, the company reinforces its commitment to water security and dependable 24/7 water service for its customers.
KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.