The Jerusalem PostIDF confirms vehicle struck in Gaza was used by PIJ terrorists, after claims they were aid workersBollywood HungamaSCOOP: Ajay Devgn and Bhushan Kumar in talks for a big-budget spy thriller; looks at 2028 releaseZDF heuteAktuelle Pressemitteilungen des ZDFFootball ItaliaSerie A | Parma 1-5 Roma: Malen hero with four goals as big names returnANSA SportCalcio: Serie A, Parma-Roma 1-5NOSKlimaattop al een dag uitgelopen en onderhandelingen lijken muurvast te zittenGuardian SportIreland 20-17 South Africa: Nations Championship rugby union – live7sur7“Ma campagne était dans l’impasse”: François Ruffin retire sa candidature à la présidentielleBillboardGorillaz Celebrate Mexico’s ‘Revolutionary Spirit’ at Corona Capital, Bring Out Johnny Marr and TruenoANSAMorta la stilista Raffaella Curiel, 'l'intellettuale della moda'RTP DesportoCeltic goleia antes de visitar o TorreenseStraits Times SportLeeds bare their teeth to batter old foes Chelsea
The Daily Newsstand · Free, Always
Saturday, November 21, 2026

Lagos reopens rehabilitated section of Ozumba Mbadiwe road

Translate
Lagos reopens rehabilitated section of Ozumba Mbadiwe road

Ozumba Mbadiwe road…Photo Credit: Facebook | Festus Olarenwaju Ojo

The Lagos State Government has reopened the Adetokunbo Ademola section of Ozumba Mbadiwe Road, linking the 1004 area to Sir Samuel Manuwa Street, Victoria Island, after completing its rehabilitation.

The Senior Special Assistant on New Media to Governor Babajide Sanwo-Olu, Jubril Gawat, announced the reopening in a post on X on Saturday.

Gawat said the Lagos State Office of Infrastructure and the Ministry of Transportation, led by the Special Adviser to the Governor on Infrastructure, Olufemi Daramola, carried out the reopening earlier in the day.

He said the section, which was scheduled for rehabilitation within 35 days, was completed in 33 days.

The rehabilitation was part of the Lagos State Government’s efforts to improve traffic flow and road conditions along the busy Ozumba Mbadiwe corridor, which connects parts of Victoria Island and Lekki.

Before the project began, the government announced a 35-day traffic diversion to allow contractors to carry out the rehabilitation, advising motorists to use alternative routes to reduce congestion.

The project prompted temporary changes to traffic movement around Adetokunbo Ademola Street, Civic Centre and Sir Samuel Manuwa Street.

“The Special Adviser, on behalf of Mr Governor, thanked Lagosians for their patience all through this period. He says this critical section was scheduled to be done in 35 days and it was eventually done in 33 days,” Gawat wrote.

He said further work along the Ozumba Mbadiwe axis would resume after the festive season in 2027.

The reopening followed the Lagos State Government’s October announcement of a 35-day rehabilitation project covering the stretch from Adetokunbo Ademola Street/Civic Centre to Samuel Manuwa Street/BJ, Victoria Island.

The government had announced traffic diversions to enable the rehabilitation, with motorists advised to use alternative routes during the construction period.

Gawat said the Special Adviser, on behalf of the governor, thanked Lagos residents for their patience during the rehabilitation.

He added that other sections of the road would be worked on after the festive season.

View the original on Punch →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.