Reconstruction of Terminal 1, Murtala Muhammed International Airport, Lagos
Murtala Muhammed Airport, Lagos…Photo Credit: FAAN
This involves a major reconstruction contract approved in 2025. The Federal Airports Authority of Nigeria oversees the project.
Contractor
China Civil Engineering Construction Corporation.
Contract cost
The project cost is N712 billion, funded through Nigeria's Renewed Hope Infrastructure Development Fund as part of a larger N919 billion aviation upgrade. This covers Terminal 1 rehabilitation, Terminal 2 expansion, roads, aprons, and bridges.
Timeline
Construction began in March 2026 and is projected to span 22 months, barring delays, with Terminal 1 fully closed during this period. A temporary 8,000 m² departure hall handles operations in the interim, supporting up to 1,500 peak-hour passengers.
Scope of work
- Dangote, marketers cut petrol prices as crude falls
- NCAA orders 30-minute updates during flight disruptions
- Delta boosts Los Angeles flights with 200 departures
Work strips Terminal 1 to its concrete core for structural reinforcement, then rebuilds with modern systems including HVAC, plumbing, electrical, mechanical, security, and baggage handling upgrades. It includes internal layout reconfiguration for separated arrival/departure flows, facade upgrades with glass curtain walls, and optimised passenger movement. Terminal 2 expands by 15,000 m² for wide-body aircraft, with elocated hangars.
New facilities
Key additions feature a skywalk linking the multi-level car park to Terminal 2, a connection building unifying T1 and T2, and new ring roads with a bridge for seamless access. Other enhancements include a dedicated transit area, automated e-passport gates, smart HVAC/lighting, upgraded lounges, retail zones with cultural elements, redesigned landscapes, and advanced CCTV/security coverage.
Passenger capacity
17.6 million annually
All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from PUNCH.
KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.