CNN Türkİstanbul’da lodos; bazı vapur seferleri iptal edildiDaily MaverickOLD ROADS AGAIN: Melba-toast memories and boerie rolls served on Italian blue Spode (Part One)Bollywood HungamaMohitt Maalik to play antagonist opposite Tiger Shroff in spiritual action film VajrInquirerBacoor City eyes penalties for emergency hotline prank callersPunchVIDEO: FIFA president arrives in Delta for Warri stadium inspectionThe Jerusalem PostIraqi forces to deploy in Kataib Hezbollah stronghold under deal to ease militia tensionsInquirer EntertainmentMiss Universe 2025 Fatima Bosch praises PH’s Bea Millan-WindorskiThe South AfricanFive things South Africans must do as flash flood alerts loomZDF heuteAktuelle Pressemitteilungen des ZDFIl Fatto QuotidianoÈ morto il cavallo che ha vissuto per 20 anni da solo in un borgo “Potevamo solo alleviargli il dolore alle gambe. Ci ha fatto capire che non ce la faceva più”The Sydney Morning HeraldAFL draft LIVE updates: Overjoyed picks give interviews from school graduations as second round kicks into gearSportstarCyclone Akvan impact — Sethu FC vs Gokulam Kerala IWL 2026-27 clash cancelled due to torrential rain
The Daily Newsstand · Free, Always
Friday, November 20, 2026

Jakarta MRT reaches 85.3 pct annual passenger target through October

Translate

Jakarta (ANTARA) - Jakarta’s mass rapid transit operator, PT MRT Jakarta, carried 42.66 million passengers between Jan. 1 and Oct. 30, 2026, reaching 85.33 percent of its full-year target of 50 million riders, the company announced Friday.

“PT MRT Jakarta (Perseroda) has served 42.66 million passengers as of October 30, 2026,” MRT Jakarta Director of Operations and Maintenance Mega Tarigan said in a statement in Jakarta.

According to service performance data, daily ridership averaged 140,347 passengers over the 10-month period, with weekday averages hitting 163,915 compared to 95,951 on weekends.

Monthly ridership trended upward starting in the second quarter.

Following 4.20 million trips in January, 3.73 million in February, and 3.64 million in March, passenger numbers rose to 4.35 million in April before easing to 4 million in May.

Ridership climbed again to 4.51 million in June and peaked at 4.76 million in July, followed by 4.32 million in August, 4.42 million in September, and 4.74 million in October.

Single-day ridership hit a record high of 204,570 passengers on Monday, June 22, boosted by a promotional 1-rupiah fare for Jakarta’s 499th anniversary, a city festival around the Bundaran HI roundabout, and integrated free feeder bus services.

Dukuh Atas BNI Station was the network’s busiest destination with 7.38 million trips recorded through October, followed by Blok M BCA Station at 4.91 million.

Operationally, the rail service maintained a 100 percent service delivery rate, alongside 98.98 percent arrival punctuality, 99.89 percent dwell-time accuracy, and 99.96 percent travel-time accuracy.

On the infrastructure front, overall construction for the 5.8-kilometer MRT Jakarta Phase 2A extension—running northward from Bundaran HI toward Kota and West Ancol—reached 66.13 percent completion by the end of October, surpassing its year-end target of 65.03 percent.

Within the project, work package CP201 (Bundaran HI–Harmoni) stood at 95.13 percent completion, CP202 (Harmoni–Mangga Besar) reached 71.82 percent, and CP203 (Mangga Besar–Kota) hit 88.34 percent.

Translator: Luthfia M, Fauzul Azhim Bin Fakhrurazi
Editor: Aditya Eko Sigit Wicaksono
Copyright © ANTARA 2026

View the original on Antara News →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.