CNN TürkMilyonlarca kişiyi ilgilendiriyor: Gayrimenkul alım satımında yeni kurallar geliyorThe Jerusalem PostPakistan launches precision airstrikes on Afghanistan following thwarted drone attack from borderPunchEngland can win trophies without copying Spain’s style — GordonBollywood HungamaHurun Rich List 2025: Shah Rukh Khan’s Rs. 12,490 crore wealth surpasses the combined wealth of Juhi Chawla, Hrithik Roshan & Karan JoharESPNMen's divisional rankings: 'Pitbull' Cruz beats Bravo to enter junior welterweight top 5InquirerCyclone east of N. Luzon expected to enter PAR Thursday morning한겨레Korea to waive highway tolls during this week’s Chuseok holidayESPN DeportesJavier Aguirre y sus cinco mejores momentos en EspañaSky TG24Insetti e vermi nel cibo destinato ai bambini: blitz dei Nas e sequestri a CaivanoRapplerFACT CHECK: Marcos did not say he wants another 6-year presidential termSCMP ChinaWhy did Trump wear gloves to greet China’s Xi Jinping at Joint Base Andrews?7sur7“Il a violé leur fille de quatre ans”: comment les violences sexuelles deviennent des armes de guerre en Ukraine
The Daily Newsstand · Free, Always
Thursday, September 24, 2026

NGCP: 5-hour red alert status over Visayas grid on September 24, 2026

Translate

Make this your preferred source to get more updates from this publisher on Google.

Power interruptions may occur from afternoon until evening as red and yellow alert statuses are declared over the Visayas grid due to tight energy supply, the National Grid Corporation of the Philippines (NGCP) said on Thursday, September 24.

In an advisory, the red alert status is up from 4 p.m. to 9 p.m. The yellow alert status, on the other hand, would be in effect from 2 p.m. to 4 p.m., and 9 p.m. to 10 p.m.

The Visayas grid is currently running with an available capacity of 2,292 megawatts (MW) against a peak demand of 2,495 MW.

The red and yellow alert status declarations are due to the unavailability of several large coal plants in the Visayas: Therma Visayas, Inc. Unit 1, Panay Energy Development Corp. Unit 3, and KEPCO SPC Power Corporation Unit 2.

The grid operator also cited the temporary unavailability of power import from Luzon due to the requested emergency shutdown of Tabango-Kananga 230kV Line 2 by customer to undertake emergency repairs of their defective equipment.

A red alert status is issued when power supply is insufficient to meet consumer demand and the transmission grid’s regulating requirement.

Meanwhile, a yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.

To address the thinning energy reserves in the Visayas grid, the Department of Energy (DOE) earlier ordered the NGCP to install over 250 megawatts of battery energy storage system.

The DOE is also mulling to tap liquid fuel facilities to help power up the grid. — RSJ,GMA News

View the original on GMA News

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.