Daily MaverickTHE FINANCIAL WELLNESS COACH: How to protect your family finances when freelancing is your new full-time careerThe Jerusalem PostFormer Joint List leader Ayman Odeh suspected of receiving foreign funds in Shin Bet election probeInquirer EntertainmentAte Gay’s wake open to public; burial set for Nov. 10InquirerBulacan gov’t construction sites enforce El Niño health breaksZDF heuteEntdecken Sie das ZDF-NachrichtenstudioTagesschauLiveblog zu den Midterms: ++ Berichte: Johnson will nicht Fraktionschef bleiben ++DW 中文专访:民主党赢得中期选举如何影响美国的对华政策?Rai NewsAddio a Tinto Brass, una vita contro ogni censura. Suo il cinema della trasgressionePolsat NewsKryzys w Trybunale Konstytucyjnym. Niemieckie media wskazują winnychMexico News DailyWill Pope Leo XIV visit Mexico in 2027?CNN بالعربية"الأمريكيون قالوا لا للحرب".. كيف قرأ قاليباف نتائج انتخابات التجديد النصفي؟CBS NewsDemocrats win House majority with Trump approval at historic low
The Daily Newsstand · Free, Always
Wednesday, November 4, 2026

Palembang waste to energy project enters commissioning phase

Translate

Palembang (ANTARA) - Coordinating Minister for Food Affairs Zulkifli Hasan and Palembang Mayor Ratu Dewa inspected a waste to energy (WtE) facility in Palembang, South Sumatra, on Wednesday.

"The project, worth nearly Rp3 trillion in investment, has entered the operational testing, or commissioning phase," Zulkifli said.

He said although the facility was still undergoing operational trials, electricity generated from Palembang's waste had already been connected to the state electricity company's (PLN) grid, with output exceeding the initial target.

The facility was initially designed to generate 17.7 megawatts (MW) of electricity but is currently producing 18.6 MW, with output projected to reach 20 MW during peak load periods.

"It has entered the commissioning phase and is undergoing operational trials. Only a few refinements remain. God willing, it will be fully operational by December 2026 and ready for inauguration," Zulkifli said.

According to the minister, the project offered three direct benefits to residents, starting with a cleaner environment.

Related news: Indonesia open to electricity exports at right price: minister

The 1,100 tons of waste collected daily by the Palembang city government would no longer accumulate and pose risks of fires, methane emissions, and microplastic contamination, but instead be processed into energy.

Another benefit is electricity generation, which could supply between 14,000 and 15,000 households in Palembang.

The project is also expected to create employment opportunities for 500 to 1,000 local workers.

"Imagine how something that previously posed serious environmental problems can now be turned into electricity. Technology has transformed it into something beneficial," he said.

Meanwhile, Palembang Mayor Ratu Dewa said the WtE project had reached 98.5 percent completion and was scheduled to be inaugurated by President Prabowo Subianto on December 8, 2026.

To ensure an adequate supply of waste for the facility, he said, the city government had maintained regular waste collection, averaging 1,100 tons per day.

"However, we still need an additional 171 waste collection vehicles. The South Sumatra provincial government has provided assistance, and the city government has requested another 50 vehicles from the central government," he said.

With the WtE facility set to become operational, Palembang is positioning itself among the first cities in Indonesia to turn its waste management challenges into an energy solution for residents.

Related news: President Prabowo urges BRIN, universities to tackle village waste

Translator: Edo, Azis Kurmala
Editor: Bayu Prasetyo
Copyright © ANTARA 2026

View the original on Antara News →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.