PunchEPL: João Pedro wins EA Sport Premier League August player awardDaily MaverickTHE GATHERING 2026: ‘Not too late to turn around SA’s municipalities with the right people in charge’CNN TürkESMA'dan piyasa uyarısı: Ani düzeltme riski artıyorThe Jerusalem PostRosh Hashanah: The time to look inward and reveal what is unseenInquirerDOJ respects court decision as Sara Duterte arraignment deferredוואלהבכיר בממשלת תימן: החות'ים השתלטו על האי האסטרטגי מיוןInquirer EntertainmentPH-Australian film ‘First Light’ chosen as Australia’s official entry to 2027 OscarsBollywood HungamaSagar Pictures Entertainment unveils first teaser poster of Shrimad Bhagavatam Part I: titled VishnurataScreen RantDungeon Crawler Carl: Crawler Chaos Officially Lands November 2026CBS NewsWoman who answered first 9/11 call meets flight attendant's family 25 years laterColliderDenzel Washington’s Forgotten ‘Se7en’ Replacement Officially Takes Over NetflixSCMP ChinaSingapore and mainland China top global student assessment as OECD scores hit record low
The Daily Newsstand · Free, Always
Friday, September 11, 2026

Kelapa Gading-Manggarai LRT expected to launch in September

Translate

Jakarta (ANTARA) - Jakarta Governor Pramono Anung expected that the delayed inauguration of the Kelapa Gading-Manggarai LRT (Light Rapid Transit) route can take place in September 2026.

"I hope the inauguration can be held this September," he said when met here on Friday.

He said construction of the Kelapa Gading-Manggarai LRT is already complete. Key aspects, such as signaling and the railway system, are also ready for use.

In addition, the area beneath the LRT has also begun to be tidied up ahead of planned greenery work. Aside from the readiness of the railway system, connectivity between the LRT and bus rapid transit Transjakarta at several stations has also been prepared.

The connectivity is expected to make it easier for passengers to switch transportation modes once the Kelapa Gading-Manggarai LRT begins operating.

Anung also said another trial run of the Kelapa Gading-Manggarai LRT has been carried out. According to the results, travel time from Kelapa Gading to Manggarai was recorded at around 28 minutes.

"Another trial run was conducted recently, and the travel time from Kelapa Gading to Manggarai was 28 minutes," he said.

Amid preparations for the operation of the Kelapa Gading-Manggarai route, the Jakarta provincial government will also proceed with construction of the LRT line from Manggarai to Dukuh Atas.

The governor said construction of the roughly 2.1-kilometer extension can already begin.

"I have also requested that construction of the extension from Manggarai to Dukuh Atas, which is around 2 or 2.1 kilometers, can start now, and the budget is already available," he said.

Previously, Jakpro President Director Iwan Takwin said the trial run of the Kelapa Gading-Manggarai LRT route was focused on ensuring service readiness, human resources, and other supporting facilities for customer comfort.

During the trial period, the LRT Jakarta operated at a maximum speed of 40 kilometers per hour and a maximum service capacity of 100 passengers.

Related news: Jakarta LRT Velodrome-Manggarai route nearly complete: Governor

Related news: Jakarta Governor eyes LRT extension to PIK 2, Soekarno-Hatta Airport

Related news: Indonesia pushes Jakarta MRT expansion to boost transit use

Translator: Lifia, Kenzu
Editor: Azis Kurmala
Copyright © ANTARA 2026

View the original on Antara News

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.