PunchWIMAFRICA seeks greater economic power for African womenCNN Türk10 KASIM RESMİ TATİL Mİ? 10 Kasım'da Okullar Tatil Mi? 10 Kasım Hangi Güne Denk Geliyor? 10 Kasım Atatürk'ü Anma Günü Yarım Gün Mü?InquirerLegazpi City declared insurgency-freeThe Jerusalem PostTrump says further military action against Iran ‘doesn’t seem necessary,’ reveals Tehran is talking한겨레국내 대표 건축잡지 ‘공간’, 환갑 특집호…건축가 김수근이 창간ZDF heuteEntdecken Sie das ZDF-NachrichtenstudioDeadline‘Paddington: The Musical’ Sets Broadway Cast With Tony Hale, J. Quinton Johnson, Jessie Mueller & MoreCumhuriyetFon soruşturmasında Saray’ın atadığı isimlere peş peşe tutuklama: ‘Ummadığınız kişileri’ Erdoğan atamış!The Hollywood ReporterAriana Grande on First Time Meeting Ben Stiller: “Directing Me in an Orgy Scene in ‘Zoolander 2’”Malay MailPertak river surge: One body recovered, seven still missing in Kuala Kubu BharuThe Sydney Morning HeraldAustralia news LIVE: Beaconsfield mine disaster survivor Todd Russell dies; Consumer confidence among homeowners plummets
The Daily Newsstand · Free, Always
Tuesday, November 10, 2026

Okpebholo vows to reclaim flooded areas

Translate
Edo, Monday Okpebholo

File photo: Governor Monday Okpebholo of Edo State.

The Edo State Governor, Monday Okpebholo, has promised to reclaim all the areas flooded by erosion caused by heavy rain, assuring residents that roads in the affected areas would also be repaired.

The governor stated this on Monday during an inspection tour of road projects as part of activities to mark his second anniversary on November 12.

He said the inspection was to determine how the flooded areas could be reclaimed, noting that the road from Ekhewan water retention to Gelegele would be repaired to make life easier for residents of the area.

He added, “When I came to this area, there was no road that was completed, and now, under my government, I have ensured that the road is completed. I will also make sure that the ponds in the area are completed to stop flooding in the area.”

At the flyover under construction in Adesuwa on Sapele Road, Okpebholo told the contractors to ensure that the project is completed in January next year.

The governor also visited the RCC junction, Ogheghe bypass and the old Sapele Road, which have either been completed or are nearing completion.

He then proceeded to Ikpoba Hill and Tempoga to inspect drainage and road projects, linking the Ramat Park flyover through Lucky Way, from where the entourage connected to the completed Amufi road.

All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from PUNCH.

View the original on Punch →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.