PunchMorning recap: FG announces 19 international job vacancies, Jimmy Odukoya sues sister, seven others, other top storiesThe Jerusalem PostOver two-thirds of wounded soldiers returned to combat since start of war, IDF says한겨레주택정책 성적표, ‘세입자 주거비’로 매겨야 [아침햇발]InquirerOmbudsman affirms preventive suspension order vs Dalaguete mayorZDF heuteEntdecken Sie das ZDF-NachrichtenstudioSRF NewsKrieg in der Ukraine – Russischer Frachter nahe Finnland von Drohnen getroffenSözcüFırtınada ağaçlar ve direkler devrildi매일경제싱가포르 접수한 제주흑돼지…엄격관리·품종 고급화 통했다Wirtualna PolskaOszust podszywał się pod księdza. Proboszcz ujawnił, co go zdradziło경향신문조국, 혁신당 ‘당명 개정’ 제안 “당명 속 ‘조국’ 제 이름 아니지만…범민주 좋아할 이름 찾자 ”Daily MailHonorary Cyrus! Elizabeth Hurley joins family photos at Miley's wedding as boyfriend Billy Ray's date along with son Damian… amid engagement rumorsVanguard2027: Who speaks for the North as ACF crisis deepens?
The Daily Newsstand · Free, Always
Sunday, November 22, 2026

Empty Vande Bharat train travels 463 km with faulty brakes; probe ordered

Translate

Empty Vande Bharat Express travels 463 kilometres with faulty brakes after railway staff ignore loco pilots’ warnings; South Eastern Railway orders probe into safety lapses

The SER zone subsequently issued an official order asking the Divisional Railway Manager (DRM) of Ranchi to investigate the matter. (File photo of Vande Bharat)

An empty Vande Bharat train travelled 463 km from Jharkhand to Uttar Pradesh in October despite concerns that its braking system was not functioning effectively. The incident has prompted the South Eastern Railway (SER) zone to order an investigation, as the movement of a train with inadequate braking posed a possible safety risk to other passenger services.The incident occurred on October 24, just days before the Kolkata-Sairang Express derailed in Assam on November 11 in circumstances involving allegedly similar negligence, according to a PTI report.

Vande Bharat with faulty brakes runs empty

The rake, comprising empty Vande Bharat chair cars, was scheduled to be hauled by a goods locomotive from Hatia in Jharkhand to Jhansi in Uttar Pradesh.According to railway officials, the braking arrangement of the passenger train had to be connected to the braking system of the freight locomotive assigned to pull it for the entire journey.

However, railway personnel allegedly failed to ensure that the two systems were properly integrated. They also reportedly proceeded with the movement despite the train crew raising concerns about the braking performance.Highlighting the seriousness of the lapse, the railway zone said, "Running a train without adequate brake power is a serious safety concern that may lead to a major accident, endangering the lives of staff and passengers and affecting the safety of railway operations,"The SER zone subsequently issued an official order asking the Divisional Railway Manager (DRM) of Ranchi to investigate the matter.

The order stated that instructions had been issued on October 24 for the empty Vande Bharat rake to be transferred from Hatia to Jhansi.The document, dated November 7, recorded that the locomotive pilot had carried out the prescribed brake feel and brake power test after the train departed from Hatia. The check was conducted on the Hatia-Ranchi section, in keeping with the instructions then in force.The order stated, "As per the statement of the loco pilot, the brake feel and brake power test was conducted after departure from HTE (Hatia) in the HTE-RNC (Hatia-Ranchi) section, in accordance with the existing instructions in force,"However, the test reportedly revealed a serious problem with the train's ability to brake effectively.

The order added, "However, during the test, the LP found that the brake power of the train was very poor and ineffective."When the train reached Ranchi station, the locomotive pilot formally reported the problem in writing to railway personnel, including the section controller and traction loco controller. His complaint specifically raised concerns about the inadequate braking power.Despite the warning, the rake was allowed to continue towards its destination without the reported problem being resolved. The railway zone's order noted, "The train was permitted to proceed in the same condition despite the reported poor brake power,"The railway zone’s order recorded that the problem persisted even after another locomotive pilot took charge of the train at Muri station.

He, too, alerted the relevant controllers about the ineffective brakes, specifically pointing out that releasing the BP pressure did not activate them.Despite warnings from the train crew along the route, the issue was not addressed until the rake reached Deen Dayal Upadhyaya (DDU) station in Uttar Pradesh’s Chandauli district. Railway personnel at DDU then examined the train and discovered that the braking systems across all its coaches had been isolated, leaving the coaches without functioning brakes.The preliminary investigation attributed the incident to lapses involving several categories of railway personnel. These included coach and wagon (C&W) maintenance staff, section controllers and traction controllers at the stations concerned, as well as the crew responsible for operating the rake between Hatia and DDU.The inquiry specifically questioned the failure of C&W personnel to carry out a physical inspection of the braking systems before the empty rake was cleared for departure.

Checking the condition and functioning of the train’s equipment was part of their maintenance responsibilities, the order noted according to the PTI report.It further pointed out that railway staff did not respond appropriately even after being informed that the train’s braking power was inadequate. The order also identified a gap in the train crew’s familiarity with Vande Bharat’s braking arrangement. Because they were unfamiliar with the system, the crew did not physically verify whether the brakes in the individual coaches were engaging.Summing up the findings, the order stated, "From the above, it is evident that there were multiple failures on the part of various staff, resulting in the train being worked without effective train brakes,"The document said the rake covered approximately 463 km without its coaches’ braking systems being used. During the journey, the train relied exclusively on the locomotive’s brakes and regenerative braking.

Calling for a detailed examination of the incident, the railway zone concluded, "In view of the above, it is requested that the matter should be investigated in detail to ascertain the lapses on the part of the staff concerned. Necessary corrective and preventive measures may also be taken to prevent the recurrence of such incidents in the future,"

View the original on Times of India →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.