InquirerLegarda wants unnecessary spending in 2027 nat’l budget slashedThe Jerusalem Post‘Forever chemicals’ in tap water linked to earlier deaths in prostate cancer patients - reportPunchSoldiers kill suspected terrorist in PlateauInquirer Entertainment2NE1’s CL joins THEBLACKLABEL, sets ‘ICONIC’ comeback at 2026 MAMAХабрКак перестать гадать на кофейной гуще и начать понимать свою команду: гид по типологиям для тимлидов и менеджеровZDF heuteAktuelle Pressemitteilungen des ZDFWirtualna PolskaSuperpełnie 2026: Księżyc rozświetli niebo w WigilięCBS NewsThanksgiving travel likely to dip a bit due to prices, AAA saysSouth China Morning PostUN chief urges countries to rein in ‘killer robots’ on the battlefieldIl Fatto QuotidianoPanico sulla Grande Muraglia cinese, la neve trasforma i gradini in una trappola di ghiaccio: turisti in difficoltà scivolano lungo il percorso. Le immaginiLa TerceraSquella y crisis por rebaja de condenas: “Ha existido una campaña muy injusta en contra del ministro Rabat”BBC NewsFive EU countries expected to announce migrant deportation centre in Rwanda
The Daily Newsstand · Free, Always
Monday, November 16, 2026

Chow welcomes RM84.3m coastal protection projects as erosion affects 51 Penang areas

Translate
Penang Chief Minister Chow Kon Yeow today welcomed the implementation of seven projects worth RM84.26 million to address risks in coastal areas in the state. — Bernama pic

Penang Chief Minister Chow Kon Yeow today welcomed the implementation of seven projects worth RM84.26 million to address risks in coastal areas in the state. — Bernama pic

By Opalyn Mok

First Published: Monday, 16 Nov 2026 5:12 PM MYT

GEORGE TOWN, Nov 16 — Penang Chief Minister Chow Kon Yeow today welcomed the implementation of seven projects worth RM84.26 million to address risks in coastal areas in the state.

He also welcomed the implementation of the Penang Integrated Shoreline Management Plan (ISMP) study, which began in June 2025 and is scheduled for completion in June 2027.

“The findings of the study will guide the state government and relevant agencies in planning development and managing coastal areas, taking into account current conditions and erosion risks,” he said in a statement issued today while referring to a reply to his question in the Dewan Rakyat recently.

He said the seven projects are to be implemented by the Ministry of Energy Transition and Water Transformation (Petra) through the Penang Department of Irrigation and Drainage (DID).

According to the reply by Petra minister Datuk Seri Fadillah Yusof, the seven projects included three completed projects, two under implementation and two at the pre-implementation stage.

“They include the RM61.24 million project to construct outfalls and coastal erosion prevention structures in Batu Ferringhi and Tanjung Bungah, and the RM10 million project to construct and repair coastal bunds in Bagan Lebai Tahir,” he said.

The total expenditure on these projects as of September this year is estimated at RM16.8 million.

The minister said Petra is also conducting the ISMP study.

According to the ministry, 51 coastal areas in Penang covering 16.3 kilometres were identified as experiencing erosion.

“Of these, seven areas covering 5.6 kilometres were classified as Category One, with erosion rates of between 4.7 and 17 metres a year,” he said.

He said the DID does not have specific annual records of the number of critical coastal erosion incidents for the period from 2020 to 2026 and the available data is based on the National Coastal Erosion Study (NCES) 2015.

The NCES 2015 identified and assessed the extent of coastal erosion throughout the country.

The study classified coastal erosion into three categories based on the rate of shoreline retreat, the extent of erosion and its impact on the affected areas.

Category One is critical erosion, involving shoreline retreat of more than four metres a year, usually in areas with residents, economic activities, infrastructure and public facilities.

Category Two is significant erosion, with a retreat rate of more than one metre but less than four metres a year, while Category Three is erosion that is not yet serious, with a retreat rate of less than one metre a year.

View the original on Malay Mail →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.