The Jerusalem PostNetanyahu's inner circle is now almost entirely religious, cabinet secretary saysPunchPSG’s Kvaratskhelia to undergo surgery after ACL rupture – OfficialDaily MaverickTIME TO REFOCUS: SA’s URC teams face northern examination as club season ramps upBollywood HungamaEXCLUSIVE: Gulshan Devaiah DEBUNKS Wikipedia's claim that he made his debut in Salman Khan's Dil Ne Jise Apna Kahaa: “Even I have seen it and I laugh at it!”InquirerMarcos, Angara roll out Yakap health caravan in SuluSouth China Morning PostAttitudes shifting in Hong Kong’s favour as city reaps Apec benefits: Paul ChanRTL BoulevardAbdi A., verdachte dood Hajar, werd opgepakt bij pleegvader in SpierdijkZDF heuteEntdecken Sie das ZDF-NachrichtenstudioCNN بالعربيةتحليل.. من "الأسطول المظلم" إلى الديزل الروسي.. لا "حلول سحرية" لخفض أسعار الوقود بأمريكاVanguardNigeria’s 11m-tonne cold storage gap exposes food supply weakness7sur7L’horreur à Toulouse: un homme aurait tué trois membres de sa famille avant de se suiciderCapital FMSix oil tankers among 51 ships expected at Mombasa, Lamu ports
The Daily Newsstand · Free, Always
Wednesday, October 21, 2026

Data centre gas plant could be mothballed after two years, court told

Translate

A gas-fired power station proposed for the NSW Southern Highlands could be mothballed once the grid can meet the energy demands of an onsite data centre, a court has heard.

The NSW Land and Environment Court is considering an appeal by developers Nakar Property, after Wingecarribee Shire Council refused its development application for a 16-megawatt power station and battery energy storage system in Moss Vale.

The station is one of three planned to power a data centre campus on site proposed by Sydney company Cloud Carrier.

Barrister James Smith, acting for Nakar Property, told the court the power plant was needed to provide constant power for customers using the centre.

"[Cloud Carrier's] investment in computers is circa a $1 billion; the fundamental requirement is firm supply," Mr Smith said.

"It's akin to enrolling your child in school without any teachers; Cloud Carrier can't sell any product unless there is firm supply."

image of door with "cloud carrier" logo on it

The proposed gas-fired power plant would be used to run Cloud Carrier's data centre campus. (ABC Illawarra: Penny Burfitt)

The second day of hearings before Commissioner Nicola Targett came after the court travelled to Moss Vale to inspect the site of the $23 million project on Tuesday.

In his opening submissions, Mr Smith said developers would stop using gas power as soon as a reliable supply of energy from the grid could be secured.

"The cost savings per year via connecting to the grid is approximately $14 million per year," he said.

"There is clear financial incentive to use the grid when that power becomes available. The issue is there is not sufficient supply."

Referencing expert reports, Mr Smith said the power plant was projected to emit less greenhouse emissions than if it were powered by the grid until approximately 2029.

Grid touted as a 'panacea'

Addressing Commissioner Targett, barrister Michael Staunton, for Wingecarribee Shire Council, said that power supplied by the grid had been touted as a "panacea" to the project, but not investigated thoroughly.

"All of that work and investigation should have been done, and you'll find when you get to the documents, it hasn't been," Mr Staunton said.

After an adjournment, Wingecarribee Shire Council tendered draft conditions of consent in the middle of the hearing.

These included a new requirement that canopy trees be planted across approximately 40 per cent of the development site.

Expert air-quality, electrical and engineering consultants appeared as witnesses for cross-examination about reports they had prepared for the project.

Mr Staunton argued during cross-examination that the project would not have the secure power needed to fill the full capacity of servers in the proposed data centre for two years, when an upgrade of a nearby power substation operated by Endeavour Energy would be completed.

"You've got no firm supply for two years," Mr Staunton said.

"That time could be spent negotiating with Endeavour Energy while you wait for the permanent connection."

The matter will return to court on Thursday for a third day of hearings.