PunchOndo orders removal of abandoned heavy vehicles, equipment on roadsCNN TürkFransa'da grev dalgası: Ülke genelinde sokaklara döküldülerDaily MaverickROVING REPORTERS: Inside the Gauteng caves where rocks reveal the mysteries of Homo nalediThe Jerusalem PostIran receives US feedback on seven-day trust-building plan, main issue is sequencingInquirerHouse prosecution to present Duterte’s bank records within the weekCapital FMIsrael-bound flight diverted after fight between pilotsObservador DesportoPortugal regista 2.º maior número de expulsões na UEABC NewsLast US troops expected to leave Iraq on Wednesday following 12-year ISIS fightColliderThe 10 Best Slice-of-Life Books, RankedThe GuardianIsrael-bound passenger plane makes emergency landing in Saudi Arabia after reported fight between pilotsNotJustOkFor Me Lyrics by FidoStraits Times SportForever our champion: Gym pays tribute to S’porean muay thai fighter who died after bout
The Daily Newsstand · Free, Always
Wednesday, September 30, 2026

KTM Komuter, ETS services resume after Batang Benar-Labu power line repairs

Translate
A KTMB worker inspects repair works on overhead line equipment between Batang Benar and Labu following the disruption on September 30, 2026. — Picture courtesy of KTMB

A KTMB worker inspects repair works on overhead line equipment between Batang Benar and Labu following the disruption on September 30, 2026. — Picture courtesy of KTMB

By Malay Mail

First Published: Wednesday, 30 Sep 2026 3:44 PM MYT

KUALA LUMPUR, Sept 30 — KTM Komuter Klang Valley and ETS services have resumed normal operations after repair works on the overhead power line between Batang Benar and Labu were completed at 1.41pm today, Keretapi Tanah Melayu Berhad (KTMB) said.

In a statement, KTMB said KTM Komuter and ETS services on the Pulau Sebang-Batu Caves-Pulau Sebang route were operating as usual, although some ETS journeys could still face temporary delays as train movements and schedules are readjusted.

KTMB thanked passengers for their patience and apologised for the inconvenience caused by the disruption.

Earlier today, Malay Mail reported that services were disrupted from 6.24am after a 25kV overhead power line between Batang Benar and Labu was severed.

Preliminary checks indicated that an animal was suspected of coming into contact with both a live wire and an earth wire, triggering the electrical fault.

View the original on Malay Mail →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.