Daily MaverickAgribusiness exploits humans and animals alike – legal protections should be species-blindThe Jerusalem PostLuigi Mangione's New York murder trial postponed amid double jeopardy challengeESPNOhio State, Oregon start 1-2 in AP preseason pollוואלהחשש למחדל נוסף באסותא: תורם הזרע של הילדים אינו תואם גנטיתESPN Deportes¿Quién es Joshua Báez? El dominicano del histórico debut de 3 jonronesABC NewsSupporters rally for justice for California dog amid animal cruelty investigationSCMP ChinaClaims Hegseth ‘on verge of losing job’ raise questions about future US-China defence tiesNTVSon dakika deprem mi oldu? Az önce deprem nerede oldu? İstanbul, Ankara, İzmir ve il il AFAD son depremler 18 Ağustos 2026SDP Espectáculos¿A qué hora termina Sam Smith en Auditorio Nacional? Horario del 17, 18, 20 y 21 de agostoABC News (Australia)Stress-free Book Week costumes with a musical twistThe StandardSecurity failure? Interior chiefs on the spot over Homa Bay chaosBillboardJoe Budden Wants Drake to Go Directly at Jay-Z: ‘Bait Him, Let’s Have Some Fun’
The Daily Newsstand · Free, Always
Monday, August 17, 2026

Nvidia investing $1.5B in SoftBank data center developer behind OpenAI project

Translate
Jensen Huang
Image Credits:Chesnot / Getty Images
  • Tim De Chant

Nvidia said on Monday that it will invest $1.5 billion in SB Energy, a data center linked to SoftBank and OpenAI.

The investment ensures that Nvidia will be the sole supplier of compute infrastructure at OpenAI’s Ports-Pike data center near Cincinnati, Ohio. Nvidia will also provide up to $105 billion in credit to help build the facility, which could scale from an initial 4.25 gigawatts to 8 gigawatts in size, according to documents the company filed with the SEC.

SB Energy’s existing investors include SoftBank and OpenAI. SoftBank had previously held $5.8 billion worth of Nvidia stock, which it sold in November to help fund other AI investments.

The data center and power developer will build a 9.2 gigawatt natural gas power plant on the site, which is land owned by the U.S. Department of Energy. The site previously enriched uranium for the U.S. nuclear arsenal and for U.S. Navy submarines.

The power plant is expected to cost $33 billion. The steep sum reflects the skyrocketing costs of building natural gas power plants, which have risen 66% in the last two years, according to BloombergNEF.

By the time SB Energy’s power plant and others are completed, they’ll be competing for natural gas with export markets, a confluence that could triple natural gas prices in some parts of the country.

View the original on TechCrunch

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.