Daily MaverickDémarching Orders: SA government démarches new Nigerian high commissioner over social media commentsInquirerSumlang Lake Christmas village in Albay draws 8,000 visitorsThe Jerusalem PostUK Charity Commission opens case into London's Jewish community center over West Bank job advertsRai NewsFuturo24. Dall'Emilia al cielo: progetti internazionali all'INAF di BolognaZDF heuteEntdecken Sie das ZDF-Nachrichtenstudio3DNewsMicrosoft научила Windows окирпичивать украденные ноутбуки — файлы при этом не пострадаютBBC News BrasilFérias, alistamento militar e 'viagem falsa' à Nova Zelândia: as loucuras que fãs de 'GTA 6' estão fazendo pelo lançamentoNHK 社会【動画】Pickup NEWS(11月18日)20 MinutenNvidia verdoppelt Umsatz – mitten im SpionageskandalESPN DeportesPortugal amarra liderato de grupo con gol de su nuevo ‘7’SCMP ChinaUS Navy chief urges US lawmakers to strengthen shipbuilding capacity to close gap on ChinaTechCrunchSEC reportedly investigating Nvidia amid Huang exit
The Daily Newsstand · Free, Always
Tuesday, November 17, 2026

Yobe Airport: Senate approves Tinubu’s request to refund ₦100.5 billion

Translate

The Senate on Tuesday approved President Bola Tinubu’s request to reimburse the Yobe State Government ₦100.5 billion for the construction of the Muhammadu Buhari International Cargo Airport in Damaturu, the state capital.

The decision was taken after considering a report of the Senate Committee on Local and Foreign Debts, presented during the plenary by its Chairman, Aliyu Wamakko (APC, Sokoto North).

The reimbursement will be made through promissory notes. A promissory note is a written and signed commitment to pay a specified sum of money to a named person or the bearer, either on a specified date or on demand.

President Tinubu requested the reimbursement in October after the federal government took control of the airport ownership.

Report

Mr Wamakko said committee members met on 27 October to review documents related to the president’s request.

READ ALSO: Reps move to investigate attacks on 10 power transmission towers

He said the committee established that the Federal Ministry of Aviation had confirmed the airport’s construction through a technical audit, which indicated the project was fully completed and complied with international standards.

PT WHATSAPP CHANNEL

Dangote Refinery AD

The senator also said the contract was awarded in compliance with Bureau of Public Procurement (BPP) requirements.

He added that the airport was fully constructed and operational, with flights already taking off, making it ready for federal takeover.

After the presentation, Senate President Godswill Akpabio put the request to a voice vote, and most lawmakers voted in favour.

View the original on Premium Times →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.