Bollywood HungamaNitish Bharadwaj withdraws praise for Ramayana Part 1; says he is “deeply upset and disappointed” with Ranbir Kapoor starrerPunchI sexually assaulted, filmed debtor naked — SuspectThe Jerusalem PostHuckabee compares Israel to Taiwan, urges US cooperation with both against cyber threatsInquirerDOH: 7 in 10 Filipino deaths due to noncommunicable diseasesDaily MaverickWHAT’S COOKING: A hunk of beef braaied on the coals, served with chimichurriColliderNetflix Officially Revives One of the Worst Fantasy Remakes Ever MadeSouth China Morning PostChina-linked critical minerals price swings delay 1 in 4 energy-storage projects: reportZDF heuteAktuelle Pressemitteilungen des ZDFCBS NewsWhat stores are open and closed for Veterans Day 2026?Football ItaliaRoma eye Gasperini reunion with Atlético Madrid’s LookmanHipertextual‘Los Anillos de Poder’ temporada 3 (★★★★☆) aprende de sus errores y arranca más vibrante y oscura que nuncan-tvVorwurf überteuerter Medikamente: Bericht legt massiven Steuerbetrug durch Mönchsorden nahe
The Daily Newsstand · Free, Always
Wednesday, November 11, 2026

Mahama breaks ground for $98.41m project to expand Takoradi Port’s cargo handling capacity

Translate

President John Mahama has broken ground for the construction of the 300-metre-long Berth 19 facility at the Takoradi Port, a project expected to expand the port's capacity to handle larger vessels and increased volumes of cargo.

The $98.41 million project is expected to improve the handling of bulk cargo, particularly mineral ores for export and clinker imported for cement production.

Speaking at the groundbreaking ceremony, President Mahama said the expansion has become necessary because of increasing demand and capacity constraints at the port's dry bulk terminal.

He explained that the facility would allow the port to handle more mineral exports and imported bulk products.

"BERTH-19 is very important," he said, adding that the project would increase the port's capacity for bulk cargo handling.

President Mahama said significant investments had been made in expanding the Takoradi Port since 2012, including dredging works to allow larger vessels to dock.

He noted that the port, which was originally established during the colonial era mainly to facilitate the export of commodities such as timber, cocoa, bauxite and manganese, has evolved into both an import and export hub.

The President also disclosed that the construction of the Berth 19 facility is expected to take 26 months, expressing hope that the government would return to commission the project within that period.

The groundbreaking ceremony also marked the commencement of work on a floating dry dock project, which President Mahama said was the first project under Ghana's Growth Partnership with the United Kingdom.

He described the commencement of the two projects as an important step towards strengthening Ghana's logistics and transport infrastructure.

"In today's world, the logistics value chain is very important, so expanding your ports, building your railways, and reconstructing your roads are all things that are necessary to give the economy that oomph so that it can take off," he said.

Add MyJoyOnline as a preferred source on GoogleSee more of our stories when you search on Google. (opens in a new tab)

DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.

Tags:  

DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.

View the original on MyJoyOnline →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.