Bengaluru Metro Pink Line: PM Modi to inaugurate new stretch on November 13; check route, stations and key details

Prime Minister Narendra Modi will inaugurate the 7.5-km elevated section of Bengaluru Metro's Pink Line on 13 November. The opening will take Namma Metro's operational network beyond 100 km, adding seven stations and a key interchange with the Yellow Line.
Bengaluru's long-awaited Metro Pink Line is set to take a major step towards opening, with Prime Minister Narendra Modi scheduled to inaugurate its 7.5-km elevated section on 13 November 2026.
PM Modi to inaugurate new route in Bengaluru's Pink Line metro
The stretch, connecting Kalena Agrahara and Tavarekere in south Bengaluru, has already received safety clearance, bringing passenger services closer to reality.
The inauguration will also take Bengaluru's operational Metro network beyond the 100-km mark for the first time. Once the new section opens, Namma Metro's operational network will expand from 96.1 km to 103.6 km, making it India's second-largest Metro network after Delhi.
Bengaluru South MP Tejasvi Surya confirmed the date in a post on X, while Greater Bengaluru Development Minister Krishna Byre Gowda also announced the development. Surya said Modi would travel from Tavarekere to the IIMB-Bilekahalli station before formally launching commercial services.
Which stations will open on 13 November?
The first operational section of the Pink Line will cover seven stations:
Kalena Agrahara
Hulimavu
IIMB
JP Nagar 4th Phase
Jayadeva Hospital
Ragigudda
Tavarekere
The new stretch is expected to benefit commuters travelling along Bannerghatta Road and people living or working around Hulimavu, JP Nagar and the Indian Institute of Management Bangalore (IIMB).
One of the most important stations on this section will be Jayadeva Hospital. It will provide an interchange with the existing Yellow Line, which connects RV Road with Bommasandra and serves the Electronics City IT corridor. This will give commuters from south Bengaluru another way to reach the city's major employment areas without depending entirely on road transport.
The 7.5-km elevated stretch received clearance from the Commissioner of Metro Railway Safety (CMRS) on 28 October, following inspections and safety assessments. The approval was an important step towards starting passenger operations.
What about the remaining Pink Line route?
The 7.5-km elevated section is only part of the larger Pink Line project. The complete corridor will run for approximately 21.25 km, connecting Kalena Agrahara in south Bengaluru to Nagawara in the north.
It will include a 13.76-km underground section, which is still undergoing work. The remaining stretch requires the installation and integration of platform screen doors and signalling systems before it can begin passenger operations.
The Bengaluru Metro Rail Corporation Limited (BMRCL) has indicated that trial runs on the underground section are planned for November. The section is expected to become operational in 2027, with the corporation targeting May 2027 for the opening of the entire Pink Line.
The complete corridor will have 18 stations and is expected to improve connectivity between several important residential, commercial and employment areas of Bengaluru.
How long will it take to finish construction?
The Pink Line has faced several construction delays, with work on its elevated section beginning in 2017. The project was expected to open much earlier, but construction and other technical requirements pushed back the timelines.
The upcoming opening is particularly important for commuters who regularly travel along Bannerghatta Road, where traffic congestion is a common problem during peak hours.
For now, the 13 November event is expected to mark the beginning of passenger operations on the elevated section. The bigger milestone will come when the underground stretch is completed and the entire Pink Line becomes operational in 2027.
About the Author
Trisha Bhattacharya is a Senior Content Producer at Livemint, with over two years of experience covering entertainment news from India and beyond. She spends her days tracking what’s trending, breaking down pop culture moments, and turning fast-moving entertainment stories into sharp, engaging reads that actually make people want to click — and stay. <br> She holds a Master’s degree in English Literature from Lucknow University, a background that shapes her love for layered narratives, strong voices, and stories that linger long after they’re told. Before joining Livemint, Trisha worked with India Today as an entertainment journalist and film critic. There, she reviewed films, covered industry news, and built a strong foundation in storytelling and cultural analysis. <br> Trisha enjoys working at the intersection of media, culture, and audience interest, always looking for fresh angles and formats. Films, shows, and music are not just her beat but her biggest passion — something that naturally reflects in her writing. Whether it’s cinema, streaming shows, music, or internet trends, she approaches every story with curiosity and intent. <br> Outside the job description, she’s unapologetically passionate about films, shows, and music — sometimes a little too passionate, if you ask her. That enthusiasm often spills into her work, adding personality, urgency, and a touch of chaos that keeps her writing alive. For Trisha, entertainment isn’t just a beat — it’s a language she speaks fluently.
KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.