Inquirer‘Judicial overreach’: OSG sets challenge vs SC rulingDaily MaverickBOOK EXCERPT: Paradise found – A full-throttle view of Africa’s island treasuresESPN DeportesOKC supera a Nuggets en un juego definido hasta el finalPunchNollywood veteran, Francis Duru, dies at 57ESPNAppalachian St. ends James Madison's undefeated start to season한겨레군 당국 “북한, 2024년 이후 DMZ에 지뢰 96만발 매설 추정”CNN TürkCUMA MESAJLARI YENİ RESİMLİ 2026 | Dualı, Ayetli, Hadisli, En Güzel, Anlamlı, Kısa Hayırlı Cumalar Mesajları ve SözleriZDF heuteAktuelle Pressemitteilungen des ZDFRapplerA decade later, threat of Kidapawan unrest looms again as El Niño ravages farmsالنهاربريطانيا تجيز حقل "جاكدو"... هل يعزّز الغاز المحلي أمن الطاقة ويخفّض الفواتير؟SportstarIndia vs New Zealand: Ishan Kishan ruled out of 2nd T20I after injuryHet Laatste Nieuws‘Top Gun’- en ‘Alien’-acteur Tom Skerritt overleden op 93-jarige leeftijd
The Daily Newsstand · Free, Always
Friday, October 23, 2026

ECRL Gombak station’s covered link bridge to LRT ready by March 2027, temporary walkway in place for December launch

Translate
Transport Minister Loke Siew Fook with guests of honour at the launch of the Comprehensive Inspection Train (CIT) at the ECRL Gombak Integrated Terminal recently. — Picture courtesy of MRL

Transport Minister Loke Siew Fook with guests of honour at the launch of the Comprehensive Inspection Train (CIT) at the ECRL Gombak Integrated Terminal recently. — Picture courtesy of MRL

By Malay Mail

First Published: Friday, 23 Oct 2026 10:42 AM MYT

KUALA LUMPUR, Oct 23 — Passengers using the East Coast Rail Link (ECRL) Gombak station will have a temporary walkway to the Gombak LRT station when services begin in December, while a permanent covered pedestrian bridge linking the two is set for completion by March 2027, Malaysia Rail Link Sdn Bhd (MRL) said today.

In a statement this morning, MRL said the bridge will also extend to the Gombak Integrated Terminal (TBG), while the temporary walkway will run through existing connecting areas and Prasarana facilities.

It said the temporary route will take into account passengers’ safety, comfort and ease of movement, including for those carrying luggage.

It added that it is also in talks with Prasarana on a proposed shuttle service between the two stations as an additional option, particularly for passengers with luggage.

MRL was responding to public concerns over passenger movement between the ECRL Gombak station, the Gombak LRT station and TBG.

It stressed that pedestrian access and public transport integration at the station had been factored into the ECRL project’s development plans from the outset.

The company said providing pedestrian access is part of its effort to ensure the ECRL Gombak station functions as a public transport hub integrated with the existing rail and transport network.

It also gave an assurance that temporary access is being arranged to meet passenger needs when services open, while the permanent bridge is completed in stages.

View the original on Malay Mail →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.