The Jerusalem PostThe new Inquisition: Jewish students shouldn't have to pass loyalty tests at universities - opinionPunchDelta rally killing: Police arrest four한겨레‘무죄 확정’ 김범수, 내년 2월 카카오 인적분할 앞 공개 행보 관심Rolling StoneMike Love, Beach Boys Co-Founder Who Kept Band Alive for 65 Years, Dead at 85DeadlineMike Love Dies: Beach Boys Co-Founder Who Sang & Wrote Era-Defining Hits Was 85Lenta.ruРаскрыты подробности массового ночного налета ВСУ на российский регион경향신문정부, 고 명진 스님에 국민훈장 무궁화장 추서 “한국 불교 신뢰 높이는 데 이바지”الشرقهندوراس.. ضحايا ومصابون إثر تحطم حافلة ركابالنهارأوكرانيا على نار التصعيد لا الحلSportstarIndia vs New Zealand, 2nd Test Day 3 LIVE score: Conway, Ravindra stabilise; NZ 84/2 (27), leads by 194 runsLa NaciónElecciones España 2026, EN VIVO: Sánchez y Feijóo disputan la presidencia y las últimas noticias del 29-N, voto a votoGlobo EsporteJapão x Brasil - Amistosos da Seleção Feminina 2026 - Ao vivo - globoesporte.com
The Daily Newsstand · Free, Always
Sunday, November 29, 2026

You are reading New Straits Times on KioskNews: newspapers from many countries on one stand, each linked to its original. What other papers report

Sarawak polls: Asajaya constituents look forward to waterfront project revival

Translate

KOTA SAMARAHAN: Kampung Tambirat villagers in Asajaya are hoping the revival of the Tambirat Waterfront project will boost tourism, stimulate economic growth and create more opportunities for the local community, most of whom depend on agriculture and small-scale trading.

Their hopes were rekindled following the Sarawak government's decision in September to proceed with Phase 2 of the project, which will stretch about one kilometre and is estimated to cost over RM100 million.

Besides serving as a tourist attraction and community space, the development is also intended to protect the village's riverbanks from erosion.

Chairman of the Kota Samarahan Municipal Council (MPKS) hawker centre in Tambirat, Asrizal Amran, 46, said reviving the long-stalled project could breathe new life into the local economy by attracting more visitors to the existing hawker centre.

He said the development would complement existing business activities, particularly at the hawker centre, which houses about 124 stalls offering a variety of goods and services.

"We hope the long-stalled project can resume, with construction suited to local conditions, especially after earlier structural problems forced work to stop.

"Perhaps the original design was not quite suitable. We hope the new plans will take the area's conditions into account and that work can begin as soon as possible," he told Bernama.

Asrizal said the waterfront project could also enhance the appeal of the MPKS hawker centre, which opened in November 2023, and draw more visitors to the area.

Sharing similar hopes, Bujang Abang, 60, said he believed the authorities would resolve the issues affecting Phase 1, paving the way for the second phase to proceed.

The local snack and food trader said it would be a major loss if the project failed to materialise, given its potential to attract visitors, increase local incomes and spur development in Asajaya.

For Ogayah Derahman, 55, who started selling food by the roadside before moving to the hawker centre, the waterfront development represents a long-held dream she hopes will finally become a reality.

The mother of four said the project could stimulate the local economy through tourism and community activities, bringing in more customers and improving the livelihoods of small traders like herself.

Meanwhile, Kampung Tambirat Lot village head Zamzari Suut, 56, said reviving the project could transform the village's social and economic landscape, particularly for residents who largely depend on agriculture.

"We hope the project will bring more than just physical changes to Tambirat by creating new economic opportunities for residents without affecting their traditional livelihoods," he said.

Sarawak Tourism, Creative Industry and Performing Arts Minister Datuk Seri Abdul Karim Rahman Hamzah had previously said the state government must address the problems affecting Phase 1 while proceeding with Phase 2 as part of a comprehensive waterfront development and riverbank erosion-control plan in Kampung Tambirat.

Asajaya is one of three state constituencies under the Kota Samarahan parliamentary constituency. Abdul Karim retained the seat unopposed in this state election.

View the original on New Straits Times →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.