The Jerusalem PostMost Israeli Jews fast on Yom Kippur, while over half take part in prayer services, survey findsPunchNorth Korea fires ballistic missile into East Sea — South KoreaDaily MaverickIN PICTURES: Memorial run in honour of Elizabeth ‘Tsontso’ Moselakgomo in Kempton Parkוואלהאם ושני ילדיה נהרגו ממתקפת כטב"מים רוסית על קייבInquirerFair Sunday weather in most parts of PH; ‘habagat’ to affect S. LuzonCNN TürkHava Durumu (20-09-2026)한겨레숭실대 기계공학부 항공 학술동아리 '천금비', 자작항공기 경진대회서 우수상·장려상 수상Inquirer EntertainmentSarah Labahti, McCoy de Leon lead cast of Darryl Yap’s first horror film ‘VHS’Straits Times SportSingapore’s Gan Ching Hwee wins historic 1,500m freestyle silver at Asian GamesSözcüŞişli'de kadın sürücülerin yol kavgası kamerada: "Kafanı kırarım" deyip camdan içeri saldırdıUOLPrevisão do tempo em Ivaiporã neste domingo (20)VanguardOsimhen to miss AFCON qualifiers due to groin injury
The Daily Newsstand · Free, Always
Sunday, September 20, 2026

DPWH issues show-cause order to Taguig building contractor over CDO violation

Translate

Make this your preferred source to get more updates from this publisher on Google.

The Department of Public Works and Highways (DPWH) has issued a show-cause order to the contractor of a multi-purpose building in Taguig City for allegedly violating a cease-and-desist order (CDO) linked to illegal reclamation in Laguna de Bay.

According to a DPWH Metro Manila 1st District Engineering Office document obtained by GMA News Online, the contractor, whose name was not disclosed, continued construction despite the CDO issued on August 20.

“Please be advised that any continued non-compliance with the Cease-and-Desist Order, which remains in effect, may constitute non-compliance with the directives contained in the said Cease-and-Desist Order,” the September 18 document read.

The contractor was given five days from receipt of the show-cause order to explain why no appropriate administrative, contractual or other action should be taken against it.

“Failure to submit your written explanation within the prescribed period shall be construed as a waiver of your opportunity to submit an explanation, and the DPWH may proceed with the appropriate action based on the available records and evidence, without prejudice to other remedies available under existing laws, rules, regulations, and applicable contract provisions,” the order read.

The CDO covers the construction of two multi-purpose buildings at the Lakeshore Complex in Barangay Lower Bicutan, Taguig City.— MCG, GMA News

View the original on GMA News

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.