The Jerusalem PostIsrael Fire and Rescue Authority seeks ban on electric scooters on trains amid saftey concernsDaily MaverickPUBLIC ACCOUNTABILITY OP-ED: Cape Town’s baboons — the rising cost of deciding without independent ethical reviewInquirerSara Duterte ‘prepared for worst’ as trial nears decisionSoompiITZY’s Chaeryeong Postpones Schedule After Falling IllLenta.ruРоссия отвергла обвинения в нарушении воздушного пространства ЕС и НАТОCollider7 Dystopian Books To Read if You Love 'The Hunger Games: Sunrise on the Reaping'NU.nlProRail zet preventief roltrappen uit na incident bij station Bijlmer ArenASportstarIndia vs New Zealand, 2nd Test Day 2 LIVE score: Jurel, Washington fighting for all their worth; IND 111/5 (36), needs 46 runs to avoid follow-onABC News (Australia)What to expect with Victoria's election count tonightESPN DeportesLuka vs. Wemby, uno a uno: ¿Quién tiene mejor temporada?中国新闻网第十届“丝路杯”泰东北高校中国语言文化大赛在孔敬大学举行RapplerThe week in photos: November 21-27, 2026
The Daily Newsstand · Free, Always
Saturday, November 28, 2026

You are reading Khaosod English on KioskNews: newspapers from many countries on one stand, each linked to its original. What other papers report

Bangchak finds heat exchanger rupture after refinery fire as 7 remain in hospital

Translate

BANGKOK — 27 November 2026, Bangchak’s preliminary findings on the Phra Khanong refinery fire show a heat exchanger in the Hydrocracking Unit ruptured. All production units were shut down for safety, and experts are urgently investigating the cause and assessing damage. Seven injured remain hospitalized, and air quality within a 5 km radius is confirmed to be normal.

Bangchak Corporation Public Company Limited has issued an update on the fire at its Bangchak Phra Khanong refinery. The company sincerely apologized for the incident on 26 November 2026 and said it immediately shut down all production units after the fire, putting safety first.

Preliminary inspection found that a heat exchanger at the Hydrocracking Unit ruptured. Experts are currently investigating the sequence of events and the root cause, as well as assessing the damage to the equipment. The company continues to control the incident area and restrict access because the production process involves chemicals and is complex.

Bangchak purged residual gas from the system to international standards, which may periodically produce steam-like plumes. Air quality is monitored in real time, around the clock, within a 5 km radius of the refinery.

Latest readings at 07:00 on 27 November 2026 show air quality around the refinery within normal levels, consistent with the Pollution Control Department’s 08:00 measurements.

Seven people remain hospitalized: 1 employee and 6 contractors. Two others have been reported with minor injuries and have since been able to return home. Bangchak has stated that they will care for those injured in full, monitor their condition, coordinate closely with their families, and provide fair compensation. Updates will follow.

View the original on Khaosod English →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.