PunchMorning recap: Heatwave bites hard, Sowore Ekiti attack, FG’s transport allowance debate, other top storiesThe Jerusalem PostUS judge orders Trump administration to stop threats to prosecute state, local election officialsCNN TürkSAĞLIK BAKANLIĞI ATAMA KURASI TAKVİMİ | 2026 yılı 3 dönem ilk defa ve yeniden atama kurası başvurusu ne zaman?ESPN⚾ Sights and sounds from Brewers' championship paradeInquirerIligan City holds Alimyon Flower Festival in time for UndasESPN DeportesAngulo rescató una victoria clave de último minutoUN NewsSomalia looks to the future as the UN's political mission closesZDF heuteEntdecken Sie das ZDF-Nachrichtenstudio3DNewsПоставки процессоров для смартфонов рухнули на 21 % — но Apple и Samsung это на руку매일경제160만명 홀린 부산 명물 ‘부캉이’ 어디 갔나…닷새째 감감무소식VanguardOsinbajo, CJN, AGF to storm Abia for NBA-SPIDEL conferenceالنهارفضل شاكر يطرب جمهور الخبر مع إطلاق موسمها الثاني
The Daily Newsstand · Free, Always
Saturday, October 31, 2026

MMDA suspends road works ahead of Christmas season

Translate

MANILA, Philippines — The Metropolitan Manila Development Authority (MMDA) has temporarily suspended all road excavations in national and city roads in Metro Manila.

The suspension is meant to avoid worsening the expected heavy traffic congestion to be brought by the Christmas season.

In an advisory on Saturday (October 31), the MMDA said that the temporary suspension of road works will take effect on Sunday (November 1) at 12 a.m.

Article continues after this advertisement

It will last until December 23 at 12 a.m.

FEATURED STORIES

NEWSINFO

NEWSINFO

NEWSINFO

“This is intended to minimize disruptions and ensure a smoother journey for motorists, given the expected increase in the number of vehicles as the Christmas season approaches,” the agency stated.

READ: DPWH to close EDSA southbound lanes for repairs on Undas weekend

Meanwhile, under Memorandum Circular No. 20 Series of 2026, the following government infrastructure projects and emergency repairs are exempted by the moratorium:

  • Government flagship projects
  • Department of Public Works and Highways bridge repairs and constructions
  • Flood interceptor catchment project (box culvert)
  • Asphalt overlay projects without reblocking works
  • Sidewalk improvement
  • Drainage improvement projects along the sidewalk and not occupying any part of the roadway footbridge projects
  • Emergency leak repairs or breakage of water line by the Manila Water Co. and Maynilad Water Service Inc.
  • New water service connection or electrical service connections
  • Road activities without excavation (traffic clearance only)
  • Meralco relocation or emergency works affecting major government projects
  • Other projects permitted by the MMDA following the filing of a due application /apl
View the original on Inquirer →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.