Possible Intel Razor Lake-AX Prototype Exposes Four Sets of Apparent Memory Contacts

A photo said to show a prototype of Razor Lake-AX, a candidate for Intel's next-generation large APU, has been published. Contacts believed to be for memory sit beside an elongated die-like section, consistent with reports that Intel will return to on-package memory after Lunar Lake.
Prototype suggests memory mounting locations
On November 26, leaker HXL published a photo said to show Razor Lake-AX.
Beside an elongated section that appears to be a die are four contact areas, believed to be mounting points for DRAM, the semiconductor used for main memory.
Razor Lake-AX had previously been reported to use on-package memory. The newly observed contact layout is consistent with that information.
The contacts are exposed, so the photo does not show memory chips installed or reveal their capacity. It is also unknown whether the pictured object is functional, and the image confirms only its external characteristics.
Who will install the memory?
Intel placed memory on the same package as the compute components in Lunar Lake, or the Core Ultra 200V, released in September 2024. The design was intended to reduce board area and power consumption from data transfers, and offered up to 32GB of memory.
Razor Lake-AX has been reported to support memory configurations from 32GB to 128GB.
Besides capacity, the party installing the memory may also differ. Intel is reportedly planning to supply manufacturers with processors that do not have memory installed, leaving each manufacturer to attach DRAM during product assembly.
If implemented, the method could allow manufacturers to choose memory capacity for the intended use of each product. They might, for example, offer different capacities in thin laptops and mini PCs intended to run large AI models.
Manufacturers choosing capacity during production is different from buyers being able to upgrade it later. If memory is attached directly to the package, the capacities available at purchase will matter.
AMD already sells products with large memory capacities
PCs with large memory capacities based on AMD's Strix Halo have already launched in Japan.
On March 17, 2026, ASUS released the ROG Flow Z13-KJP in Japan, equipped with a Ryzen AI MAX+ 395 and 128GB of LPDDR5X-8000 memory. Video memory for the integrated GPU is allocated from main memory.
AMD then announced the Gorgon Halo Ryzen AI Max PRO 400 Series on May 20. It supports up to 192GB of unified memory, of which as much as 160GB can be used as GPU video memory. In its November 3 earnings announcement, AMD also reported expanding availability of systems based on the series.
Proposed Razor Lake-AX Memory Design Compared With Existing Products
| Product / target | Capacity | Implementation / use |
|---|---|---|
| Intel Razor Lake-AX Possible prototype | 32〜128GB Unconfirmed | Photo: four exposed contact areas Possibly for memory Unconfirmed proposal: supplied without memory Manufacturer installs during production |
| Intel Lunar Lake Core Ultra 200V | Up to 32GB | On same package as compute components |
| AMD Strix Halo ROG Flow Z13-KJP Released in Japan | 128GB | From main memory Allocated to integrated GPU |
| AMD Gorgon Halo Ryzen AI Max PRO 400 | Up to 192GB | Up to 160GB for GPU Can be allocated |
For running large generative AI models locally on a PC, memory capacity is important for storing model data. Products in which the CPU and integrated GPU share memory are attractive not only for graphics performance but also for the amount of data they can handle.
If the reported Razor Lake-AX capacity is accurate, Intel may offer another option for users who need large memory capacities in this market. AMD has already expanded capacity further in its successor generation, so competitiveness cannot be judged from the 128GB figure alone.
Plans for robotics also reported
The first Razor Lake-AX products are reportedly targeted for launch in the third quarter of 2027.
At an event on semiconductors and humanoid robots held in South Korea on October 16 KST, an Intel executive reportedly presented targets of a 2028 robotics launch and about 700 TOPS of AI processing performance, or 700 trillion operations per second.
The former is unconfirmed information about the first products, while the latter comes from reporting on plans for robotics. Official product information will be needed to determine how those timelines apply to different uses.
The day when Intel's and AMD's large APUs can be compared in real hardware cannot come soon enough.
KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.