InquirerMt. Guiting-Guiting climbing activities suspended for three monthsThe Jerusalem PostAmericans begin voting in midterm election races with major implications for US-Israel policyZDF heuteAktuelle Pressemitteilungen des ZDFBollywood HungamaAmit Rai exits OMG 3? Director and makers reportedly part ways over creative differencesCollider‘Shrek’ Is Officially Returning With a Brand-New ReleaseDeadlineWME Signs ‘SNL’s Jeremy CulhaneThe Hollywood Reporter‘The Cat in the Hat’ Review: Bill Hader in a Dr. Seuss Adaptation That Captures the Antic Silliness but Misses the CharmAnime News NetworkDragon's Dogma II: Dark Arisen Game ReviewBillboardHilary Duff Talks Lucky Me Tour, Pre-Show Rituals & ‘With Love’ Dance Redemption | Takes Us OutRolling StoneHow to Livestream Midterm Election-Night News for Free Without CablePopular Science‘2001: A Space Odyssey’ movie prop may sell for over $1 millionGlobal NewsJury deliberations begin in Russell Brand’s rape and sexual assault trial
The Daily Newsstand · Free, Always
Tuesday, November 3, 2026

Pertamina EP lifts Jatinegara gas output to 12.3 MMSCFD

Translate

Jakarta (ANTARA) - Pertamina EP Tambun Field raised gas production at its Jatinegara field to 12.3 million standard cubic feet per day in October, using two operational innovations to improve well performance.

"Output was nearly 1.5 times the February average of 8.3 MMSCFD, when Pertamina EP resumed management of the field," Senior Manager Totok Parafianto said in Jakarta on Tuesday.

The increase was supported by two operational innovations, CEMARA and STEP UP 2.0, introduced in April and May, respectively, he said.

Both innovations were developed to address production challenges at wells JNG-003 and JNG-004.

At JNG-003, high water production alongside gas flows required frequent intervention, reducing the well's operational efficiency.

Under CEMARA, Pertamina EP Tambun Field inspected the well to identify where water was entering before determining the appropriate corrective measures.

Gas production at JNG-003 increased to about 2.7 MMSCFD from 1.42 MMSCFD, while water production fell to about 0.5 barrels per day from 792 barrels.

The sharp reduction in water production also decreased the need for routine interventions, improving operational efficiency and increasing the well's gas contribution, he said.

Related news: PHI's 1st-quarter oil, gas production surpasses targeted 649.2 mmscfd

Related news: Pertamina's oil, gas production 98% of target as of July

Related news: PHE oil, gas production surpasses its target

Translator: M.Harianto, Rahmad Nasution
Editor: Azis Kurmala
Copyright © ANTARA 2026

View the original on Antara News →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.