NLEX operator sorry for heavy traffic, vows for concrete flood barriers

MANILA, Philippines — The Metro Pacific Tollways Corporation, operator of the North Luzon Expressway (NLEX), has apologized to motorists who have been stranded in some sections of the expressway, which were rendered impassable because of severe flooding.
The management, it said, understands the public’s frustration, saying it is “deeply sorry” for what motorists, especially those travelling with children, elderly, or individuals needing medical attention, had to go through.
It said NLEX is implementing additional engineering measures in the Tulaoc area, where concrete barriers will be deployed along 300 meters northbound and 300 meters southbound to serve as a temporary flood wall.
Article continues after this advertisement
READ: Heavy traffic at NLEx roads; Libtong Exit temporarily closed due to flood
FEATURED STORIES
NEWSINFO
NEWSINFO
NEWSINFO
Siphoning trucks will also be deployed to remove floodwater, while pumping operations will be intensified once the inflow is contained or significantly reduced.
As it explained in a statement on Monday, Aug. 31, days of continuous heavy rain have flooded the entire town of San Simon, as confirmed by Pampanga Governor Lilia Pineda in a radio interview.
“With surrounding areas underwater, pumping alone cannot keep the expressway clear while floodwater continues to enter the road,” it said.
READ: NLEX San Simon portion still impassable to Class 1 vehicles
Article continues after this advertisement
This was why from the first hours, NLEX issued round-the-clock advisories through its social media channels and 31 Variable Message Signs across NLEX, Subic–Clark–Tarlac Expressway, and the NLEX Connector, alerting motorists to conditions ahead and available alternative routes.
“MacArthur Highway, the principal alternative route, was also heavily flooded, with portions rendered impassable, leaving motorists with very limited options,” it said, pointing out that a counterflow will be established to facilitate the movement of emergency and response equipment to the affected Tulaoc area.
Article continues after this advertisement
“As a longer-term flood-mitigation measure, NLEX plans to further raise the pavement along the Northbound and Southbound sections in Tulaoc,” said the corporation, explaining that further road-raising works can be implemented once the Tulaoc Bridge has been raised to provide the necessary vertical clearance, subject to the required engineering assessment and works.
It said “our operations, patrol and emergency crews remain deployed 24/7 to assist stranded motorists.” “We will continue to keep the public informed as conditions change and thank NLEX users for their patience and understanding.” /jpv
KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.