The Jerusalem PostPalestinians deserve accountable leadership, not further delays to democracy - editorialESPN😈 Oklahoma's troll of Texas leads top jabs of CFB Week 6ESPN DeportesAmérica y Rayados se frenan tras golpearse antes del descansoInquirerNBI files graft raps vs CHR chair, 3 othersPunchPhone snatcher bags eight years’ jail한겨레“그날 구해준 덕분에 여기까지”…화재참사 생존자 12년 뒤 결혼 인사CNN TürkTrump telefonlara sarıldı! "Alo... Mazot var mı?"ZDF heuteAktuelle Pressemitteilungen des ZDFהידעןנוראקסון וננופס יבחנו מתן אקסוזומים ממוקד לעין ולעורRapplerReinhard Jumamoy’s audacity, work ethic give NU its go-to guyNew Straits TimesThousands join pro-Palestinian marches in several European cities경향신문오늘의 부고-김호 국민의힘 서울 강서병 당협위원장 부친상 외
The Daily Newsstand · Free, Always
Sunday, October 11, 2026

Public Works Dept to install Bailey bridge after sinkhole closes Gua Musang-Kota Bharu road

Translate
It was reported yesterday that the FT08 section along the Central Spine Road (LTU) project’s Packages 3B and 3C, near Kesedar Recreation Park here, had been closed to all vehicles following a sinkhole. — Bernama pic

It was reported yesterday that the FT08 section along the Central Spine Road (LTU) project’s Packages 3B and 3C, near Kesedar Recreation Park here, had been closed to all vehicles following a sinkhole. — Bernama pic

By Malay Mail

First Published: Sunday, 11 Oct 2026 11:20 AM MYT

KUALA LUMPUR, Oct 11 — The Public Works Department (JKR) will install a Bailey bridge to restore access along the Gua Musang-Kota Bharu road (FT08), which was fully closed following a sinkhole near the Kesedar Ethnobotanical Recreation Park in Gua Musang, Kelantan, yesterday.

In a media statement posted on the JKR Gua Musang Kelantan social media page today, the department said installation work would begin on October 14 and take about a week to complete.

It said the timeline would depend on ground stability and safety conditions at the site.

“JKR will continue to monitor conditions at the location and prioritise road users’ safety throughout the work.

“Motorists travelling from Kuala Lumpur to Kota Bharu via Gua Musang, and those travelling in the opposite direction, are advised to use the alternative route via FT2747, Jalan Pulai-Bandar Baru Gua Musang,” it said.

JKR also urged road users to comply with instructions and observe safety signs placed at the affected location.

It was reported yesterday that the FT08 section along the Central Spine Road (LTU) project’s Packages 3B and 3C, near Kesedar Recreation Park here, had been closed to all vehicles following a sinkhole.

The sinkhole occurred at about 9.05am, affecting an area measuring approximately eight metres deep and nine metres long.

According to reports by JKR Gua Musang and Roadcare (M) Sdn Bhd, the affected stretch is on FT08 between Sections 205.556 and 205.564, along the LTU project’s Packages 3B and 3C. 

View the original on Malay Mail →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.