PunchABUAD, United Nigeria airlines boss seek education reformCNN TürkSON DAKİKA... Afyonkarahisar'da kafa kafaya facia: 4 can kaybıBollywood HungamaTiger Shroff’s team issues statement after firing in Juhu, says actor made “no statements” about incidentThe Jerusalem PostBeneath a German lake, above a Nazi bunker: Israeli artist explores buried memory - featureInquirerTaal Volcano logs fifth eruption this October; alert level 1 staysRTP DesportoSporting recebe LASK LinzZDF heuteAktuelle Pressemitteilungen des ZDFDaily MaverickTIME TO REFOCUS: SA’s URC teams face northern examination as club season ramps upUOLItália cria novo crime para punir violência em manifestações; medida faz parte de pacote de segurançaVanguardFasoranti:​‌‍‍‍‍⁠⁠‍‌​​⁠‍‌⁠​‌​ My father had covenant with God to die at 100 – SonWirtualna PolskaTusk ostrożny ws. Ukrainy. "Nie podzielam takiego optymizmu"CNN بالعربيةنقص فيتامين د..من الفئات الأكثر عرضة للخطر؟
The Daily Newsstand · Free, Always
Wednesday, October 21, 2026

Weather modification readied to ease Java dam water deficit: Ministry

Translate

Jakarta (ANTARA) - Deputy Public Works Minister Diana Kusumastuti said weather modification has been prepared to maintain water availability following deficits in Java Island's dams due to this year's prolonged dry season.

According to Kusumastuti, the reduced water volume in dams was a direct impact of the dry season caused by an extreme El Nino phenomenon, which has kept water supply falling in various regions.

"Dams shrink because of the dry season, right? Water issues and so on. For this, we hope rain can fall, perhaps later with weather modification," she confirmed here on Wednesday.

The Public Works Ministry is trying weather modification as one step to raise the chances of rain so water reserves in dams can be maintained, she said.

Besides short-term handling, the Ministry also began identifying needs for unfinished dam construction as part of planning the 2028 fiscal year program.

Kusumastuti said the 2027 allocation for dam construction was basically already available, while follow-up needs for 2028 will be prepared from now so implementation is not delayed.

She stressed that the identification of dam construction needs will be completed soon so priority projects can support water resource security amid rising drought risk from the dry season.

Regional Infrastructure Development Agency (BPIW) Head Adenan Rasyid said the government is also carrying out weather modification operations to add water supply in areas that need it.

In addition, the Ministry has drawn up reservoir operation patterns as a step in managing water availability at each dam.

Previously, Coordinating Minister for Infrastructure and Regional Development Agus Harimurti Yudhoyono said 36 percent of dams in Java Island were in water deficit due to drought from El Nino.

In addition, 62 of 119 districts and cities in Java were affected by the drought's impact on water availability, so the government prepared mitigation steps to maintain national water supply.

Related news: Indonesia faces wildfire challenges ahead of Prabowo’s second year

Related news: Ministry deploys three pumps to irrigate drought-hit Bekasi farmland

Related news: Govt prepares food aid, rice subsidies to cope with dry season

Translator: Harianto, Kenzu
Editor: Azis Kurmala
Copyright © ANTARA 2026

View the original on Antara News →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.