PunchPower minister faces heat over blackouts한겨레오세훈 “시장 마음대로 움직일 수 있단 이재명 정부 오만, 지옥문 열었다”InquirerPolice probe discovery of unidentified woman’s body in CalapanThe Jerusalem Post‘Chutzpah Girls’: Tami Schlossberg Pruwer brings Jewish heroines to lifeZDF heuteAktuelle Pressemitteilungen des ZDFNew Straits TimesIn Chile, Cape Verde hero Vozinha struggles to cope with glare of fameEl ComercioTabla de Liga 1 2026 EN VIVO: así van las posiciones tras victoria de Melgar ante Juan Pablo IISözcüCamlarını kırdığı otomobili bir saat sonra ateşe verdiSportstarEgypt parts ways with coach Hassan, Maher to replace himThe Sydney Morning HeraldBig in Japan: Nawaqanitawase impressing new teammates in first weekSBS 뉴스민주당·정부, 오늘 고위 협의…내년도 예산안 논의 전망The Indian ExpressBuilding collapses in Old Delhi: Death toll rises to 6, building owner held
The Daily Newsstand · Free, Always
Sunday, November 8, 2026

Two hours of rain, one closed bridge: Subang’s Kampung Melayu hit by flash floods

Translate
The Jalan Kubu Gajah bridge over Sungai Subang collapsed on November 7, 2026, cutting off the main link between Kampung Kubu Gajah and Paya Jaras Hilir. — Bernama pic

The Jalan Kubu Gajah bridge over Sungai Subang collapsed on November 7, 2026, cutting off the main link between Kampung Kubu Gajah and Paya Jaras Hilir. — Bernama pic

First Published: Sunday, 08 Nov 2026 9:24 AM MYT

KUALA LUMPUR, Nov 8 — Heavy rain that lasted for about two hours caused flash flooding in Kampung Melayu Subang and Jalan Jati Bridge that spans Sungai Damansara has been closed due to erosion along the riverbank.

Selangor Fire and Rescue Department Operations Division Assistant Director Ashrul Riezal Asbar said the flash floods were caused by the overflow of the drainage system and not by the phenomenon of unusually high tides.

“Heavy rain this evening caused the drainage system to be overwhelmed by the volume of water, but water levels in the affected areas are now reported to be receding,” he said in a statement yesterday.

Meanwhile, the Selangor Public Works Department (JKR), in a separate statement, said the Jalan Jati Bridge in Section U6, Kampung Melayu Subang, had been closed to all vehicles for safety reasons following severe erosion of the bridge abutment structure.

According to the department, the erosion and embankment collapse occurred following a rise in water levels and strong currents in Sungai Damansara due to continuous heavy rain.

“A Traffic Management Plan has been implemented to regulate vehicle movement, and road users are advised to use the alternative route via Lorong Cempaka and comply with the diversion signs at the location,” the department said.

The department would also carry out temporary repair works in the affected area, subject to site safety conditions and the availability of materials from quarries, as the work would take place during a public holiday period.

For the long term, the department said an allocation would be sought to carry out permanent repairs to the bridge abutment structure and reinforce the banks of Sungai Damansara to ensure the stability of the bridge. — Bernama

* Editor’s note: JKR stands for Jabatan Kerja Raya in Malay.

View the original on Malay Mail →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.